CLARK COUNTY BOARD OF EDUCATION (OWNER) will receive proposals through Codell Construction Company (CM) to furnish all labor and materials to complete the GEORGE ROGERS CLARK HIGH SCHOOL FIELDHOUSE AND ATHLETIC FIELDS at 2745 BOONESBORO ROAD, WINCHESTER, KY 40391.  Work is to be performed in accordance with plans, specifications, and addenda prepared by ROSS TARRANT ARCHITECTS (ARCHITECT), SHROUT TATE WILSON CONSULTING ENGINEERS (MECHANICAL AND ELECTRICAL ENGINEER), ROSS TARRANT ARCHITECTS  (CIVIL ENGINEER), and STRUCTURAL DESIGN GROUP, INC (STRUCTURAL ENGINEER).

Drawings, specifications, and the project manual may be obtained by contacting LYNN IMAGING @ 859/255-1021.  Questions should be directed in writing to the C.M.’s attention:

JOHN HAGAN CODELL
Codell Construction Company
4475 Rockwell Road
Winchester, KY  40391
PHONE:         (859) 744-2222
FAX:               (859) 744-2225
E-MAIL:          jhcodell@codellconstruction.com

A complete set of Drawings, Specifications, and the project manual requires a refundable deposit of $300.00 payable to CLARK COUNTY BOARD OF EDUCATION.

Bids will be due by NOVEMBER 20, 2018, at 2:00 PM, and will be opened at the GEORGE ROGERS CLARK HIGH SCHOOL, 2745 BOONESBORO ROAD, WINCHESTER, KY 40391.  Each bid must be accompanied by a 5% Bid Bond.    No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids.

A pre-bid conference is scheduled for NOVEMBER 13, 2018 AT 2:00 PM at GEORGE ROGERS CLARK HIGH SCHOOL, 2745 BOONESBORO ROAD, WINCHESTER, KY 40391. All bidders are urged to attend this meeting.

The Project is to be complete within 420 calendar days from the date of the official Notice to Proceed, and liquidated damages are $1,000.00/day thereafter, if the completion date is not met.  Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project.

 