BRECKINRIDGE COUNTY BOARD OF EDUCATION (OWNER) will receive proposals through Codell Construction Company (CM) to furnish all labor and materials to complete the BRECKINRIDGE COUNTY AREA TECHNOLOGY CENTER at 1915 E. HIGHWAY 60, HARNED, KY 40144.  Work is to be performed in accordance with plans, specifications, and addenda prepared by SHERMAN CARTER BARNHART  (ARCHITECT/CIVIL ENGINEER), SHROUT TATE WILSON CONSULTING ENGINEERS (MECHANICAL AND ELECTRICAL ENGINEER), and SHERMAN CARTER BARNHART   (STRUCTURAL ENGINEER).

Drawings, specifications, and the project manual may be obtained by contacting LYNN IMAGING @ 859/255-1021.  Questions should be directed in writing to the C.M.’s attention:

JOHN HAGAN CODELL
Codell Construction Company
4475 Rockwell Road
Winchester, KY  40391
PHONE:         (859) 744-2222
FAX:               (859) 744-2225
E-MAIL:          jhcodell@codellconstruction.com

A complete set of Drawings, Specifications, and the project manual requires a refundable deposit of $300.00 payable to BRECKINRIDGE COUNTY BOARD OF EDUCATION.

Bids will be due by November 13, 2018, at 2:00 PM Central Time, and will be opened at the BRECKINRIDGE COUNTY BOARD OF EDUCATION ANNEX, 135 BANK STREET, HARDINSBURG, KY 40143.   Each bid must be accompanied by a 5% Bid Bond.  The bid will be submitted in duplicate on copies of the Form of Proposal located in the Project Manual.  Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project and Bid Package number affixed.  No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids.

A pre-bid conference is scheduled for November 1, 2018 at 2:00 PM Central Time, at BRECKINRIDGE COUNTY BOARD OF EDUCATION ANNEX, 135 BANK STREET, HARDINSBURG, KY 40143. All bidders are urged to attend this meeting.

The Project is to be Final Complete within 14 Months from the date of the official Notice to Proceed, and liquidated damages are $1,000.00/day thereafter, if the completion date is not met.  Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project.

Written by 

C0n-!conN?^hasH#